(navigation image)
Home Animation & Cartoons | Arts & Music | Community Video | Computers & Technology | Cultural & Academic Films | Ephemeral Films | Movies | News & Public Affairs | Prelinger Archives | Spirituality & Religion | Sports Videos | Television | Videogame Videos | Vlogs | Youth Media
Search: Advanced Search
Anonymous User (login or join us) Upload

View movie

[item image]

Play / Download (help[help])


All Files: HTTP
[Public Domain Mark 1.0]

Resources

Bookmark

NASAMercury 6

You are using our new video/audio player!
I prefer flash (when possible)
Give us feedback!

The Mercury 6 mission. The audio files are named as per their original historical audio reel number at the NASA historical audio vault. Information listed below is the sum-total of data on these reels.

INFORMATION ON THE AUDIO FILES:
691-AAE: 2/20/1962, Tape 1
692-AAE: 2/20/1962, Tape 2
715-AAE: 2/20/1962, Tape 3
714-AAE: 2/20/1962, Tape 4

MISSION INFORMATION:

MA-6
Friendship 7
Pad LC-14 ()
Atlas (6)

Crew:
John H. Glenn, Jr.

Milestones:
8/27/61 - Capsule arrived at Cape Canaveral
2/15/62 - Flight Safety Review
2/20/62 - Launch

Payyload:
Spacecraft No. 13, Vehicle Number 109-D

Mission Objective:
Place a man into earth orbit, observe his reactions to the space environment and safely return him to earth to a point where he could be readily found.
The Mercury flight plan during the first orbit was to maintain optimum spacecraft attitude for radar tracking and communication checks.

Launch:
February 20, 1962. 9:47:39 am EST. Cape Canaveral Launch Complex 14. Powered flight lasted 5 minutes 1 second and was completed normally.

The mercury countdown began on 1/27/62 and was performed in two parts. Precount checks out the primary spacecraft systems, followed by a 17.5 hour hold for pyrotechnic checks, electrical connections and peroxide system servicing. Then the countdown began. The launch countdown proceeded to the T-13 minute mark and then was canceled due to adverse weather conditions. After cancellation, the mission team decided to replace the carbon dioxide absorber unit and the peroxide system had to be drained and flushed to prevent corrosion. Launch vehicle systems were then revalidated and a leak was discovered in the inner bulkhead of the fuel tank that required 4-6 days to repair. The launch was rescheduled to 2/13/62 and then to 2/14/62 to all the bulkhead work to complete. The precount picked up again on 2/13/62, 2/15/62 and 2/16/62 but was canceled each time due to adverse weather. The launch was then rescheduled for 2/20/62.

During the launch countdown on 2/20/62, all systems were energized and final overall checks were made. the count started at T-390 minutes by installing and connecting the escape-rocket igniter. The service structure was then cleared and the spacecraft was powered to verify no inadvertent pyrotechnic ignition. The personnel then returned to the service structure to prepare for static firing of the reaction control system at T-250 minutes.

The spacecraft was then prepared for boarding at T-120 minutes. The hatch was put into place at T-90 minutes. During installation a bolt was broken, and the hatch had to be removed to replace the bolt causing a 40 minute hold. From T-90 to T-55 final mechanical work and spacecraft checks were made and the servicewas evacuated and moved away from the launch vehicle. At T-45 minutes, a 15 minute hold was required to add fuel to the launch vehicle and at T-22 minutes and additional 25 minutes was required for filling the liquid-oxygen tanks as a result of a minor malfunction in the ground support equipment used to pump liquid oxygen into the launch vehicle. At approximately T-35 minutes, filling of the liquid-oxygen tanks began and final spacecraft and launch vehicle systems checks were started.

At T-10 minutes the spacecraft went on internal power. At T-6min 30 seconds, a 2 minute hold was required to make a quick check of the network computer at Bermuda. The launch vehicle went on internal power at T-3 minutes. At T-35 seconds the spacecraft umbilical was ejected and at T-0 the main engines started. Liftoff occured at T+4 seconds at 9:47:39am EST.

Orbit:
Altitude: 162.2 x 100 statute miles
Inclination: 32.54
Orbits: 3
Period: 88min 29sec
Duration: 0 Days, 4 hours, 55 min, 23 seconds
Distance: 75,679 statute miles
Velocity: 17,544 mph
Max Q: 982 psf
Max G: 7.7

Landing:
February 20, 1962. 14:43:02 am EST. 800 miles southeast of Bermuda.

Recovered by the destroyer USS Noa. Lookouts on the destroyer sighted the main parachute at an altitude of 5,000 ft from a range of 5nm. The Noa had the spacecraft aboard 21 minutes after landing and astronaut John Glenn remained in the spacecraft during pickup. Original plans had called for egress through the top hatch but Glenn was becoming uncomfortably warm and it was decided to exit by the easier egress path.

Mission Highlights:
Mission Successful. First American in orbit. Total time weightless 4 hours 48min 27sec. During the flight only two major problems were encountered: (1) a yaw attitude control jet apparently clogged at the end of the first orbit, forcing the astronaut to abandon the automatic control system for the manual-electrical fly-by-wire system; and (2) a faulty switch in the heat shield circuit indicated that the clamp holding the shield had been prematurely released- a signal later found to be false. During reentry, however, the retropack was not jettisoned but retained as a safety measure to hold the heat shield in place in the event it had loosened.

Digitized, cataloged and archived by the Houston Audio Control Room, at the NASA Johnson Space Center.


This movie is part of the collection: NASA Images

Producer: NASA
Audio/Visual: sound, color
Keywords: NASA; Mercury 6

Creative Commons license: Public Domain Mark 1.0


Individual Files

Audio Files Flac VBR MP3 Ogg Vorbis WAVE
691-AAE 932.6 MB
132.2 MB
64.7 MB
1.6 GB
692-AAE 978.0 MB
133.0 MB
65.1 MB
1.6 GB
714-AAE 245.4 MB
32.2 MB
15.5 MB
384.3 MB
715-AAE 1,000.5 MB
135.7 MB
65.6 MB
1.6 GB
Whole Item FormatSize
MA06_TEC_jp2.zip Single Page Processed JP2 ZIP 26.2 MB
Information FormatSize
Mercury6.ffp Flac FingerPrint 184.0 B
Mercury6.md5 Checksums 188.0 B
Mercury6_files.xml Metadata [file]
Mercury6_meta.xml Metadata 5.8 KB
Other Files Text PDF
Transcript 12.4 MB

Be the first to write a review
Downloaded 520 times
Reviews


Terms of Use (10 Mar 2001)